Public, Astana
Astana Congress Centre
- Employer
- City administration
- Area
- 58,000 m²
- Floors
- 6
- Duration
- 33 months
- Planned handover
- 31.03.2028
- Current forecast
- 02.04.2028
2 days late
A 3,200-seat congress centre, running on a schedule built around winter conditions.
The centre will hold a 3,200-seat main hall, 18 meeting rooms and an exhibition hall. Outdoor works stop in winter; the schedule was built with that pause included.
In the October report the structure is one point behind plan. The gap will be closed in the last pour week before winter.
Milestones
- 20.04.2026Foundation completedDone
- 27.11.2026Last pour before winterPlanned
- 31.03.2028Provisional acceptancePlanned

Site report
Astana Congress Centre
Astana, 58,000 m², 6 floors
- Planned handover
- 31.03.2028
- Current forecast
- 02.04.2028
- Difference
- 2 days late
- StructureActual %33 / Planned %34
- FacadeActual %0 / Planned %0
- MechanicalActual %4 / Planned %4
- ElectricalActual %3 / Planned %3
- FinishesActual %0 / Planned %0
- LandscapingActual %0 / Planned %0