The curved facade of the hotel tower at sunset.

Commercial, Batumi

Batumi Coast Hotel

Employer
Hotel investor
Area
28,600 m²
Floors
22
Duration
26 months
Planned handover
01.06.2025
Actual handover
27.05.2025

5 days early

A 260-room hotel, handed over five days before the season opened.

The hotel holds 260 rooms, a conference hall and a rooftop restaurant over 22 floors. The handover date was tied to the opening of the summer season.

Room bathrooms were built as prefabricated pods in the factory and placed floor by floor. That decision cut four weeks from the finishes.

The glass facade grid under a cloudy sky.
Next projectRiyadh Vocational Training Campus